Show admin view
Flex PLI: Detailed Review of Drawing Package and Itemized Check against Master Leg Impactor SN03
Document GTR9-07-14
3 July 2013
Submitted by BASt and BGS
Download document
Previous Documents, Discussions, and Outcomes
5. | Review of the status of the drawing package and manual

Mr. Gehring presented document GTR9-7-14 on behalf of BASt. He explained the activities at BASt in detail and summarized that in fact the most mistakes or open issues were found to be uncritical. Mr. Burleigh was able to comment some of the Mr. Gehring’s remarks on short notice.

Relates to GTR No. 9 |